| Project Portfolio - Telecommunications |
| Featured Telecommunications Projects: |
| Station Modifications |
|
MBTA Contract: J70CN01 General Contractor: City Lights Electrical Co., Inc. Completion Date: January 2001 City Lights Electrical was the General Contractor on this project. The scope of work included: Site work, sign structure fabrication, variable message sign installation, fiber optic cabling, Fiber terminations, certified testing of fiber optic cabling, concrete work, and the installation of CES Bungalows. |
| Bechtel Parsons Video Surveillance |
|
Completion Date: 1995 Installation of video surveillance cameras and cabling along the CA/T to monitor worksites. |
| Blue Line Track, Signal & Power Relocation |
|
MBTA Contract: T12CN01 General Contractor: JF White Completion Date: 2001 Relocation of fiber optic, telephone and data cabling, wayside telephone equipment, and radiax cabling with yagi antenna under service to allow for construction of the new Blue Line Airport Passenger Station. |
| CA/T - C22A2 ITS |
|
CA/T Contract: C22A2 General Contractor: Allied Signal/Honeywell Completion Date: On-going Construction of a state of the art Intelligent Transportation Management System including the installation of: Loop Detectors, CCTV, Variable Message Signs, Lane Control Signals, Fiber Optic Backbone Cabling including Fusion Splicing and Terminations. |
| CA/T - C17A1 Emergency Fiber Rerouting and Repair |
|
CA/T Contract: C17A1 General Contractor: Modern Continental Completion Date: On-going Installation and Emergency Maintenance of fiber optic cabling, terminations, and fusion splicing. |
| CA/T Radio Tunnel Antenna System |
|
General Contractor: R. Zoppo Completed: 2000 Emergency Maintenance of tunnel antenna system. |
| Curry College - Kennedy Building |
|
General Contractor: Suffolk Special Projects Completed: 2000 Installation of a Star Topology Network including: Category 3, Category 5, Coaxial and Fiber Optic Cabling to allow for full interactive communication across the campus between classrooms, offices, and computer labs. |
| Norwood Police and Fire/Norwood Power and Light |
| Termination and fusion splicing of fiber optic cable. |
| Omni Parker House |
|
General Contractor: Structure Tone Category 5 and Coaxial Cable installation. |
| Planet Interactive |
| Category 5 cable installation. |
| Strawberry Hill Condominiums |
|
General Contractor: JK Scanlon Completed: 2000 Voice, Data, CCTV, CATV cable installation. |
| Summit |
| Category 5 and Coaxial Cabling, Network and/or Voice/Data installations. |
| Verizon |
|
General Contractor: Mosler Inc. Completion Date: 1999 Security installation of Mosler System at 5 locations in the Metro Boston area for Y2K. |
| Woburn Regional Transportation Center |
|
MPA Contract: 1.727 General Contractor: The Middlesex Corporation Completion Date: On-going Construction of a new MBTA Commuter Rail facility consisting of Station Building, Platform & Parking Areas. Installed systems include: Public Address, Passenger Assistance Intercoms, CCTV, Fire Alarm and LED Message Signs. |
| Zefer |
|
General Contractor: Completion Date: Category 5 and Coaxial Cabling, Network and/or Voice/Data installations. |
"City Lights was selected to do all the power requirements for the whole baggage screening project at Logan International Airport, mandated by the FAA at all the airports across the nation by a January 1, 2003 deadline. It should have taken over a year under normal construction terms. We completed it in just over 122 days."
- Joe Callanan, Executive Vice President
Copyright © 2005, City Lights Electrical Co., Inc.
All Rights Reserved
All Rights Reserved








