| Project Portfolio - Transportation Services - Highways |
| Featured Transportation Projects: |
| Central Artery / Tunnel Project, Boston MA |
| C09A7 - Excavation Support: I-90 |
|
Marine Tunnel General Contractor: Cashman PKA Completion Date: September 2000 Renovations of the existing South Station Postal Underground Parking Garage, Construction of Ramp L and all conduit and duct systems leading to the submersed tunnel tubes connecting to Logan International Airport. A site lighting and power system was designed, installed and is currently being maintained. |
| C09A4 - I-93/I-90 Interchange: I-95 Northbound |
|
General Contractor: SIWP Slattery, Interbaton, JF White, Perini Completion Date: October 2002 A City Lights Electrical Company - Norfolk Electric Company Joint Venture. The project has been divided into two sections. The first is the construction of three sections of tunnel to be jacked under the existing railroad tracks at South Station. The second segment is the support of installation for the elevated concrete viaducts now being installed from the South East Expressway through the South Station rail yard connecting the tunnels. The extensive conduit systems installed within the viaducts and tunnels include: 15 kV and 480 volt power, communications, antenna, fire alarm, lighting, and traffic |
| C17A1 - Congress to High Street |
|
General Contractor: Modern Continental Completion Date: July 2002 Construction of the North Bound Central Artery Tunnel from Congress Street to Broad Street, and South Bound from High Street to Oliver Street. The main scope of our work is to install an interim power system for the entire site, relocate traffic systems, and the installation of all electrical conduits and duct bank systems for the new tunnel. |
| C22A2 - I-93/I-90 - Integrated Process Control Systems |
|
Lead Contractor: Honeywell Technology Solutions, Inc. Completion Date: July 2005 |
| Additional Central Artery / Tunnel Project Work: |
|
"City Lights was selected to do all the power requirements for the whole baggage screening project at Logan International Airport, mandated by the FAA at all the airports across the nation by a January 1, 2003 deadline. It should have taken over a year under normal construction terms. We completed it in just over 122 days."
- Joe Callanan, Executive Vice President
Copyright © 2005, City Lights Electrical Co., Inc.
All Rights Reserved
All Rights Reserved