MBTA Contract: J70CN01 General Contractor: City Lights Electrical Co., Inc. Completion Date: January 2001 City Lights Electrical was the General Contractor on this project. The scope of work included: site work, sign structure fabrication, variable message sign installation, fiber optic cabling, Fiber terminations, certified testing of fiber optic cabling, concrete work, and the installation of CES Bungalows. |
| Woburn Regional Transportation Center |
|
MPA Contract: 1.727 General Contractor: The Middlesex Corporation Completed: 2001 Construction of a new MBTA Commuter Rail facility consisting of station building, platform & Parking Areas. Installed systems include: lighting, power, public address, passenger assistance intercoms, CCTV, fire alarm and LED message signs. |
| Blue Line Track, Signal & Power Relocation |
|
MBTA Contract: T12CN01 General Contractor: JF White Completed: December 2001 Relocation of track, signals, traction power cables & switches, and overhead contact system under service to allow for construction of the new Blue Line Airport Passenger Station. |
| Aquarium Traction Power Substation/Vent Shaft |
|
MBTA Contract: S00CN05 General Contractor: Walsh Northeast Completion Date: On-going Construction of a new traction power substation and vent shaft for the MBTA Blue Line. |
| Emergency Repairs to MBTA Green Line Kenmore Station |
|
General Contractor: Modern Continental Completed: 1997 Emergency repairs of lighting, power & communication systems at Kenmore Station after the flood of MBTA Green Line Subway Tunnel. |
| Cleveland Circle Rail Replacement |
|
MBTA Contract: T1CN13 General Contractor: Modern Continental Completed: 1996 Installation of signal and power bonding during complete rail replacement by the general contractor under service. |
| Neponset River Bridge |
|
MBTA Contract: C4CN06 General Contractor: Modern Continental Completed: 1995 Installation of a conduit system and steel support structures for various MBTA electrical systems along side bridge structure. |
| South Bay Undercrossing |
|
MBTA Contract: C4CN04 General Contractor: M. DeMatteo Completed: 1996 Relocation of traction power, signal, communications and contact rail systems to allow for construction of an underpass tunnel for the new MBTA Old Colony Line Commuter Rail. |
| South Bay Complex |
|
MBTA Contract: C3CN06 General Contractor: JF White Completion Date: 1997 Modifications to the existing traction power and signal system to allow for the construction of the new Broadway Bridge. The construction activities included: relocation of contact rail gaps, traction power cable, signal cable and wayside signal equipment. |
| Old Colony Plymouth Line |
|
MBTA Contract: C4CN11 General Contractor: JF White Completion Date: 1997 Installation of grade crossing, bridge and station underground conduit systems, in Braintree, Plymouth and Kingston MA. In addition, construction of an MBTA 23KV Substation located in Kingston, MA including: underground conduit and cabling, grounding grid and installation of switchgear equipment. |
| Savin Hill Flyover and Anderson Bridge |
|
MBTA Contract: T6CN02 General Contractor: M. Track Enterprises Completion Date: 1995 Support for track renovations under service including the installation of the following: contact rail & insulators, traction power, signal and communications cable, contact rail heater system and traction power disconnect switches. |
"City Lights was selected to do all the power requirements for the whole baggage screening project at Logan International Airport, mandated by the FAA at all the airports across the nation by a January 1, 2003 deadline. It should have taken over a year under normal construction terms. We completed it in just over 122 days."
- Joe Callanan, Executive Vice President
Copyright © 2005, City Lights Electrical Co., Inc.
All Rights Reserved
All Rights Reserved